As-Is
- Data sharing delays between the Czech plant and headquarters caused mismatches in shipment instruction timing.
- Order changes were not reflected in real time, resulting in delivery delays and confusion.
- In case of errors in shipment notifications (ASN), the client’s logistics system failed to update properly, posing a risk of penalties.

TO-BE
- Integrated the Czech plant’s ERP and logistics systems to improve delivery response speed
- Optimized production planning by reflecting real-time delivery schedules based on DELFOR/DELJIT
- Strengthened supply reliability and prevented logistics incidents through automatic ASN transmission